Alice Community  

Go Back   Alice Community > General Discussion > The Lounge

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
Assignment 2
Old
vstarling
Junior Member
 
Status: Offline
Posts: 6
Join Date: Sep 2016
Default Assignment 2 - 09-10-2016, 08:29 PM

I completed the project containing the lunar lander with the alien greeting . The project itself was fairly simple; once I managed to control the speed of the lander, as well as selecting a Do Together code to ensure that both aliens approached it simultaneously, it was simple enough. The only aspect that posed a challenge was the action of opening the door. There was no specific command for that, so the closest approximation for me was to move the door downward, until it disappeared into the surface of the moon.
   
Reply With Quote
 

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump



Copyright ©2024, Carnegie Mellon University
Alice 2.x © 1999-2012, Alice 3.x © 2008-2012, Carnegie Mellon University. All rights reserved.